Schedule A: Water replacement
• 7th Ave S
• Cedar St
• Walnut St to 9th Ave S
Schedule B: Water replacement
• 185th Pl SW
• 186th St SW
Schedule C: Cured in Place Pipe (CIPP) Sewer
• 7th Ave N
• 5th Ave N and the Alley between Bell St and Main St
• Alley off of Walnut between 4th and 5th
• 5th Ave S between Walnut and Holly
• Alley between Erben and Pine
Schedule D: Cured in Place Pipe (CIPP) Sewer
• 212th St SW and 80th Pl W
• Edmonds St. off Olympic Ave
• 96th Ave W
Schedule E: Cured in Place Pipe (CIPP) Sewer
• Multiple Easements (on 16856 76th Ave W, in 168th Pl SW)
• 10124 Edmonds Way Easement off of HWY 104
Schedule F: Sewer replacement
• 9th Ave N and Edmonds St
Schedule G: Sewer replacement and Cured in Place Pipe (CIPP)
• Alley off Walnut St between 3rd Ave S and 4th Ave S
Schedule H: Sewer replacement and Cured in Place Pipe (CIPP)
• Site 1 – 203rd St SW and 202nd Pl SW
• Site 2 – Post Office Easement and 76th Ave W
• Site 3 – 84th Ave W
• Site 4 – 1121 B Ave S (Side Sewer Spot Repair)
Schedule I: Cured in Place Pipe (CIPP) Stormwater
• Site 5 - Talbot Rd
• Site 6 - 185th Pl SW
Schedule J: Cured in Place Pipe (CIPP) Stormwater
• Site 3 - 236th St SW
• Site 7 - 206th St SW & 79th Ave W
• Site 8 - 196th St SW
Schedule K: Cured in Place Pipe (CIPP) Stormwater
• Site 1 - Forsyth Ln & 6th Ave S
• Site 2 - 216th St SW
• Site 4 - Walnut St & 5th Ave S
• Site 9 - Main St