Online Open House

Online Open House
Posted on 02/25/2021

Our virtual Open House took place on February 25th, 2021. For those of you who were unable to attend or those who want to review what was covered, the entire presentation is available below:


The City of Edmonds invites you to review the online open house to discuss the Highway 99 Gateway & Revitalization Stage 2 project. The objective of this project is to design and construct safety improvements and gateway signage along Highway 99 (throughout Edmonds), between 244th Street SW and 210th Street SW, consistent with the Conceptual Plans developed in the Highway 99 Revitalization Stage 1 project.

This project will convert the existing two-way left turn lane to a raised median with mid-block left-turn pockets along certain sections, as well as landscaped raised median and C-Curb along other sections in order to improve safety along the entire corridor. In addition, a High-Intensity Activated Crosswalk (HAWK) signal is proposed just north of 234th Street SW to provide an additional pedestrian crossing and improve pedestrian safety along the corridor. Gateway signs will also be added at each end of the City of Edmonds frontage on Highway 99 to help travelers identify the City limits of Edmonds and establish a consistent look that will be extended in future projects along this corridor.

If you have difficulty understanding English, you may, free of charge, request language assistance services for this project information by contacting Mr. Bertrand Hauss at [email protected] or calling at (425) 754-5325.