Water Utility

Water Utility System and Drinking Water Quality

City staff is responsible for the maintenance and operation of the Citys water distribution system for a constant and safe delivery of potable water to over 9,700 accounts.  Edmonds drinking water is purchased from the Alderwood Water District.  Alderwood Water District purchases their water from the City of Everett.  The water comes from Spada Reservoir, located at the headwaters of the Sultan River about 30 miles east of Everett.  From the Spada Reservoir, the water travels through a pipeline to the City of Everett Treatment facility at the Chaplain Reservoir.

 

 
Drinking Water Quality

drinking water dirtyWhat is a Cross-Connection?  A cross connection is an actual or potential physical connection between a "potable water" line and any pipe, vessel, or machine containing non-potable fluid, solid or gas allowing possible entry to the water system by backflow.  This would include, but is not limited to, sewers, drains, conduits, pools, storage reservoirs, plumbing fixtures, or any other device.  The non-potable or unapproved water supply system may contain contaminated liquids, solids, or gases, of unknown or unsafe quality.  Bypass arrangements such as jumper connections, removable sections, swivel or changeover devices are considered to be a cross connection.

What is Backflow?  Backflow is a flow in reverse from the normal direction of flow in a piping system.  It occurs due to a differential pressure existing between two different points within a continuous fluid system: a fluid of higher pressures flowing to a fluid of lower pressure.  Backflow may occur due to either "back-siphonage" or "back-pressure".


arrow-b  2011 Annual Water Quality Report Brochure (2.24 MB ARgif2)

 


 
Drinking Water Source and Service Area

Spada

Edmonds purchases your drinking water from the Alderwood Water District.  Alderwood Water District purchases their water from the City of Everett.  The water comes from Spada Reservoir, located at teh headwaters of the Sultan River about 30 miles east of Everett.  The Spada Reservoir, created in 1964 in partnership with the Snohomish County PUD, holds about 50 billion gallons of water.

From Spada Reservoir, the water travels through a pipeline to the City of Everett Treatment facility at teh Chaplain Reservoir.  Chaplain Reservoir is about 8 miles downstream from Spada Reservoir and holds about 4.5 billion gallons of water.

Spada Reservoir is in the Sultan Basin Watershed.  A watershed is a geographic area where all precipitation drains into a single body of water.  In the Sultan Basin Watershed, rain and snow melt from the Cascade Mountains flow into Spada Reservoir.  The Sultan Basin Watershed covers an area of about 84 square miles and is one of the wettest watersheds on the west side of the Cascade Mountains.  The average rainfall is about 165 inches, or 5 times our local rainfall.  To protect the natrually pristine water in Spada Reservoir, water quality in the Sultan Basin is carefully monitored.

 

 

i-mapMost of the incorporated City limits are servced by the Edmonds public water system.  However, areas that are both south of 220th Street (or Elm Street) and west of Highway 99 and 76th Avenue West are servced by the Olympic View Water District.

 

 


 
Interesting Facts and Information

arrow-b  The Spada Reservoir, located in the Sultan Basin Watershed and created in 1964 in partnership with Snohomish County PUD, holds about 50 billion gallons of water.  The watershed covers about 84 squared miles and is one of the wettest watersheds on the west side of the Cascade Mountains.

arrow-b  The Chaplain Reservoir, located about 8 miles downstream from Spada Reservoir, holds about 4.5 billion gallons of water.

arrow-b  City staff operates and maintains over 138 miles of distribution water mains, 18 pressure reducing stations, three 1.5 million gallon reservoirs, one 3.0 million gallon reservoir and one pumping station.

 
Sprinkler Irrigation Systems
sprinkler irrigation 2Installation of an irrigation system requires compliance with Washington State Law (WAC 245-290) and Edmonds City Code Chapter 7.20.  These Laws require that all irrigation systems have approved backflow protection.  An City permit is also required when installing an irrigation system.

Without proper backflow protection, your irrigation system could endanger the health of your family, neighbors, and others in the community who are using the public water system.

The following state approved backflow assemblies are required to be installed per City of Edmonds standards, and must be tested by a Washington State Certified Backflow Assembly Tester upon installation, repairs, relocation, and annual thereafter:

arrow-b  Atmospheric Vacuum Breaker (AVB)
arrow-b  Pressure Vacuum Breaker Assemblies (PVBA)
arrow-b  Double Check Valve Assemblies (DCVA)
arrow-b  Reduced Pressure Backflow Assemblies (RPBA)

Improper installations of a State Approved Backflow Prevention Assembly or failure to have the backflow prevention assembly tested are grounds for termination of water service.  Please note, an AVB does not required annual testing.


Sprinkler Irrigation System Permit - Please submit permit applications and/or annual assembly certifications to:

City of Edmonds
Public Works Department - Water Quality
7110 - 210th St SW, Edmonds WA  98026





 
Water Comprehensive Plan

comp dev plan icon
The comprehensive plan provides an analysis of the City's water system.  It provides planning information and will guide the City in operating, maintaining and improving it's water system and ensure existing and future customers are provided with a safe and reliable supply of drinking water and fire protection.

 




 
Water Leaks
alert-icon-red



Water pipe burst? EXAMPLES


Why should water leaks be fixed?  Higher utility bill ... water quality ... infrastructure safety ...

How do you identify?
 
Private Property -

City Right-of-Way -

For AFTER HOURS EMERGENCIES: Call 911 - the operator will dispatch a utility crew member as required.

 


 

 
Waterline Replacement - Design and Construction

backhoe

Public Works and Capital Improvement Projects - Current capital projects, city projects anddocument icon information on the City's six year capital improvement program can be found by clicking on the document link to the right.

Watermain Replacement - The City is involved in replacing over 17,000 feet of water main through 2012. Check out the latest schedule.

For daily construction updates follows us on Twittertwitter icon bird@edmondspw

  • 2010 and 2011 replacement projects are currently under construction.
  • 2012 waterline replacement is currently in the design phase.

 


 
Water Utility Contact Information
Long Range Planning,
Design and Construction
Management
Mike DeLilla, P.E.
121 - 5th Ave N, Edmonds
425.771.0220
This email address is being protected from spambots. You need JavaScript enabled to view it.


City Water System Maintenance
Jim Waite
7110 - 210th St SW, Edmonds
425.771.0235
This email address is being protected from spambots. You need JavaScript enabled to view it.


Drinking Water Quality
Linda McMurphy
7110 - 210th St SW, Edmonds
425.771.0235
This email address is being protected from spambots. You need JavaScript enabled to view it.

 

Utility Billing
121 - 5th Ave N, Edmonds
425.771.0241

 

Residential and Commercial
Development
121 - 5th Ave N, Edmonds
425.771.0220
Jeanie McConnell
This email address is being protected from spambots. You need JavaScript enabled to view it.
JoAnne Zulauf
This email address is being protected from spambots. You need JavaScript enabled to view it.
Jennifer Lambert
This email address is being protected from spambots. You need JavaScript enabled to view it.
 
 
Project Manager
Mike DeLilla, P.E.
121 - 5th Ave N, Edmonds
425.771.0220
This email address is being protected from spambots. You need JavaScript enabled to view it.
 
Waterline Projects Under Construction

 water main replacement-2 water main replacement

 

The City of Edmonds waterline improvement projects propose to replace existing water main with new 4-inch, 6-inch, 8-inch and 12-inch diameter ductile iron water main and appurtenances including, but not limited to, fire hydrants, isolation valves, tie-in connections and water services.

g-arrow  Schedules provided herein are for reference only and are subject to change.

 


 

City of Edmonds 2010 Waterline Replacement Project
PROJECT SUBSTANTIALLY COMPLETE
FINAL CLEANUP AND PUNCHLIST WORK IN PROGRESS

Timeline

Location

Type of Work

Status

May to Mid July 2011

Westgate Neighborhood 

95th Ave from 220th to 217th St SW

Waterline install, Asphalt road patch

Complete
218th Place

Waterline install, Asphalt road patch

Complete
93rd Place W

Waterline install, Asphalt road patch

Complete
217th Place

Waterline install, Asphalt road patch

Complete
217th St SW from 92nd Ave to 95th Ave

Waterline install, Asphalt road patch

Complete
215th St SW

Waterline install, Asphalt road patch

Complete

July to August 2011

Driftwood Lane

Waterline Install,

Asphalt Road Patch,

Asphalt Road Overlay

Complete
Olympic Ave & Main Street

Waterline install,

Asphalt road patch

Complete
76th Ave W, south of OVD

Waterline install,

Asphalt road patch

Complete

Sept. to Oct 2011

10th Ave N from Brookmere to Carol Wy

Waterline install,

Asphalt road patch

Complete

Olympic Ave & Main Street

Waterline install,

Asphalt road patch

Complete
12th & Viewland

Waterline install,

Asphalt road patch

Complete

Oct 2011 to Dec 2011

Cascade Lane

Waterline install, Asphalt road patch

Complete

Edmonds Street

Waterline install, Asphalt road patch

Complete


81st St & 192nd to Sierra Park

Waterline install,

Asphalt road patch,

Park restoration

Complete
206th St SW & Skyline Drive

Waterline install,

Asphalt road patch

Complete
Skyline Dr from 206th St SW to Main St

Waterline install,

Asphalt road patch

Complete
192nd St from 80th to 81st

Waterline install,

Asphalt road patch

Complete

 


 

City of Edmonds 2011 Waterline Replacement Project
PROJECT IS SUBSTANTIALLY COMPLETE
FINAL CLEANUP AND PUNCHLIST WORK IN PROGRESS

Timeline

Location

Type of Work

Status

Sept 2011 to Oct 2011

W Dayton Street

Waterline Install, Asphalt Road Patch, Asphalt Road Overlay

Complete


4th Street, Erben & Howell

Waterline install Complete.

5th Avenue

Waterline install Complete.

Nov 2011 to Dec 2011

4th Street, Erben & Howell

Waterline install

Complete
5th Avenue

Waterline install

Complete
City Park

Waterline install

Complete
January to March  2012 Homeland Waterline install and Water Services Complete
Holly Waterline Install Complete
Forsyth Waterline install Complete
4th Street, Erben, & Howell Water Services & Permanent Asphalt road patch Complete

5th Avenue

Water Services & Permanent Asphalt Asphalt road patch

Complete
City Park

Water Services and Permananent Asphalt road patch

Complete
Homeland

Water Services & Permanent Asphalt road patch

Complete
Holly & Forsyth

Water Services and Permanent Asphalt road patch

Complete

Map of the 2011 project sites: (click to enlarge)


2011-WaterProjectMap

PDF of map [CLICK HERE]



 