SEPA Determination

Hosted by: Planning Staff
The event will start on: Feb 22, 2012 (Wed) @ 8:00am
Edmonds
City of Edmonds
425.771.0220
planning@ci.edmonds.wa.us
SEPA DETERMINATION OF NONSIGNIFICANCE

The City of Edmonds is planning Low Impact Development (LID) stormwater improvements on a 1.1 acre section of Main Street between 5th and 6th Avenues. The existing street will be reconstructed with 11-foot traffic lanes and 7-foot parking lanes. Sidewalks will be widened to 12 feet from the current 10-foot width. Sidewalk bulb-outs are proposed at the intersection of 6th Avenue and Main Street and at a new mid-block pedestrian crossing. The existing bulb-out at 5th Avenue will be retained. The mid-block crossing will be raised approximately 6 inches for traffic calming. Crosswalks will be paved with stamped and colored concrete to match existing crosswalks at 5th Avenue and Main Street. The roadway surface will be paved with hot-mix asphalt (HMA). It is anticipated that approximate existing grade will be maintained and HMA paving will consist of two-inch overlay. A gravel-backfilled trench located in the center of the roadway will capture stormwater, achieving maximum separation distance from the buildings abutting the right of way on each side of the street. It is likely that existing asphalt will be ground down to accommodate the overlay and maintain existing grades. Streetscape improvements include new lighting, trees, flower poles and planters. (File No. STF20120002)

SEPA Comments are due by: March 7, 2012
APPEALS are due by: March 14, 2012 4:00 PM
CITY Contact: Mike Clugston, AICP at 425.771.0220 or This email address is being protected from spambots. You need JavaScript enabled to view it.