Construction & Inspections
MONDAY, MARCH 23, 2020: Governor Inslee "Stay Home Stay Healthy" Order For business related inquiries please call 425.275.4823
City Council Meetings under Gubernatorial Proclamation 

Edmonds Development Permitting During the COVID-19 Emergency

Effective Tuesday, March 17 — and until further notice — the City of Edmonds Development Services Department on the 2nd floor of City Hall will not be open for general public access. City Staff will continue to perform permitting activities while limiting in-person contact during the emergency.

For information on building activity and inspections to comply with the 3/25/2020 Governor's Order, please refer to the page on inspections.
For general inquiries please contact the Development Services Department at:
Email: devserv.admin@edmondswa.gov
Phone: 425-771-0220

Online permit informaton can be found here, including email addresses for inquiring about or submitting plans and applications for review.

City staff is working with applicants on a case by case basis if electronic submittal is not feasible.

At this time many commercial and residential construction projects are no longer authorized under the Governor’s Stay Home, Stay Healthy Proclamation.  Inspections will, however, continue to be performed for work related to essential activities consistent with the Governor’s Order that went into effect midnight, the night of March 25th.  The Construction Guidance document issued by the Governor can be found here

City staff will remain available and are able to provide permit assistance via telephone and email.  Administrative staff can be reached at 425-771-0220 or by email at devserv.admin@edmondswa.gov.  We appreciate your understanding during these difficult times.  Be well!

CONSTRUCTION HOURS: Sound or noise originating from construction sites as a result of construction activity is exempt from noise limits during the hours of 7:00 AM to 6:00 PM on weekdays and 10:00 AM to 6:00 PM on Saturdays.  Construction activity noise on Sunday and Federal Holidays is limited to 55 decibels.

- Report all sound or noise violations to 911.

 

REQUESTS FOR AN INSPECTION of your permitted project should be made a minimum of 24 hours prior to the date needed.  Many projects will need inspections from multiple departments including, Building, Planning, Engineering and Fire.

g-dark arrow

Inspections are performed Monday through Friday unless otherwise stated at the Development Services Department.

g-dark arrow

Inspections are typically performed between the hours of 8am-4pm.  When requesting your inspection, please note your preference for AM or PM.

g-dark arrow

For FINAL project inspections, Engineering inspections (when required by permit) must be scheduled in advance of calling for your Building final inspection.  Requests for final engineering inspections require 48 hours notice.

 

 

SCHEDULE INSPECTIONS Online or by Phone:

 

Building Inspection                 Schedule online or call (425) 771-0220 during office hours
Engineering Inspection Hotline

(425) 771-0220 ext. 1326

Fire Department Inspections

(425) 775-7720

Planning Division Inspections

(425) 771-0220 or via email

CURRENT PROJECT STATUS:

Please visit Online Permit Info to review the status of your project and to see a list of inspections that have been completed, as well as other inspections that may be required.

REMINDERS:

  • Approved plans and inspection card shall be on site and available to the inspector at all times.
  • Utility installations shall not be backfilled until approved by the inspector.
  • Concrete pours shall not commence until forms have been approved by the inspector.
  • Temporary erosion and sedimentation control is the responsibility of the contractor/owner and shall be maintained throughout the project.
  • Traffic control shall be provided to MUTCD standards and per approved plans.

Permitting Contacts

Development Services Department
121 5th Ave N
Edmonds, WA 98020

Phone: 425-771.0220
Fax: 425.771.0221

Hours:
M, T, Th, F: 8am to 4:30pm
Wed 8:30am to Noon
The switchboard is open daily from 8:00 a.m. to 4:30 p.m.  425.771.0220

Contacts:

Building Division
Planning Division
Engineering Development Staff
Code Enforcement

Building & Code News

COVID-19 Permitting

COVID-19 Emergency measures are now in effect!

2020 Development Fees

The new Edmonds development fee schedule is available here - effective January 15, 2020.

 

Sign Code Updated

The City's sign code has recently been updated, modifying how downtown sidewalk signs are regulated as well as improving some other more general sign code provisions. A summary can be found here, along with an application form.

 

Building Codes Updated

The 2018 International Building Codes as adopted by the City of Edmonds take effect on July 1, 2020.